![]() ![]() ![]() Much of this project was constructed in 2020, but the project team adapted quickly to the COVID-19 pandemic and were able to find the silver lining. Upgrades to the casino floor revamped the area with new carpeting, color palette, lighting fixtures and a LED screen overhanging the floor stretching 80 feet wide and 12 feet tall. ![]() Sundt added two resort-style pools and over 25,000 square feet of additional meeting space. Other highlights include rooftop dining and lounge Prime, A Shula’s Steak House and 11ven at Prime, offering spectacular views. The new 150-foot tower includes 205 guestrooms for a total of 447 guestrooms on the property. The project scope included construction of a 165,000-square-foot, 11-story tower that connects to the property’s existing hotel. Sundt finished work on Gila River Hotel & Casinos – Wild Horse Pass’s expansion. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |